The City of Apple Valley 2024 Capital Improvement Program identifies potential utility replacement and street reconstruction work on the following Streets:

  • Fernando Ave and Fernando Ct.

 Scope of work includes total replacement of approx. 1762 linear feet of sanitary sewer, water main and storm sewer and street reconstruction. A map of the proposed project area is attached below (Figure 1). 

 The project development tasks for the proposed improvements would involve the following scope of work. 

  •  Conduct a topographical field survey to collect ground elevation, utility locations, and surface features within the proposed work zone.
  • Conduct a geotechnical investigation and soil borings within the work zone.
  • Conduct a neighborhood informational meeting to discuss the project with residents.
  • Prepare plans, specifications, and a project cost estimate and schedule for construction.
  • Review project plans and cost estimates with the City Council prior to bid process.

SUBMIT QUESTIONS/COMMENTS IN SURVEY LINK BELOW:

CLICK HERE TO COMPLETE RESIDENT SURVEY

Contact the Apple Valley Engineering Department at 952-953-2425 or email Nate Becker at  nate.becker@applevalleymn.gov for more information.

 2024-101_Mailer_Reduced

Contact Us

  1. Brandon S. Anderson, P.E.
    City Engineer
    Email (Not monitored 24 hrs.)

    7100 147th St. W.
    Apple Valley, MN  55124

    Ph: (952) 953-2400
    Fx: (952) 953-2515

    Hours


    Monday - Friday
    8:00 am - 4:30 pm

  1. Project Information